Consultancy Services For Conducting Traffic Census, Benkelman Beam Deflection Test, Pavement Soil Investigation And Compilation Of All Test Data And Analysis For Overlay Design Following Relevant Irc Codes In Relation To Preparation Of Detailed Project Report For Strengthening Work Of Shanpukur Dariyapur Road - 0.00Km To 3.117 Km And Ghosh Para Road -25.2 Km To 25.6 Km (Barrackpore Station To Cheriamore) Pwd During The Year 2025-26.