Construction Work Of Five (05) Water Points By Boreholes Equipped With Processing Units, Divided Into Two (02) Lots And Comprising Firm And Conditional Sections, In The Ambositra District, Amoron’I Mania Region. - Lot 1: Three (03) Water Points In The Fokontany Ambohibary, Ambohipierenana And Tsileondrano Farm Bracket: Drilling Work - Conditional Tranche: Civil Engineering Works And Installation Of Equipment. - Lot 2: Two (02) Water Points In The Fokontany Morafeno And Vatovory Farm Phase: Drilling Work - Conditional Tranche: Civil Engineering Works And Installation Of Equipment.