Construction work on three (03) solar-powered pumping boreholes (3 m3/h minimum) equipped with a 5 m3 polytank tower on a 5 m high metal support, discharge and distribution pipes, and a storage basin. In accordance with the specifications and standard project plans, in Safoula, Basbéodo, and Rabinsma for the municipality of Gogo.