Frame Agreement Having As Object: The Acquisition, Transport And Installation Of The Concrete Road Parapets Lots: Lot 1: Prefabricated Concrete Parapet With H2 Protection Level And Minimal W5 Working Width; Lot 2: Prefabricated Concrete Parapet With H4B Protection Level And Minimal W5 Working Width.