The Necessary Work To Optimize The Municipal Water Network And Its Performance, With Actions Of: 1) Sectoring The Supply Network Through Fragmentation In 9 Hydraulic Sectors And The Incorporation Of The Respective Speed Meters With Pulses Emission And Integration Of These Signals Into The Supervision System. 2) Replacement Of 427 Ml Of Precarious Pipes (Concentrated In The Espona Colony District) And Up To 49 Sector Valves And Network Insulation That Do Not Close Or Leap, To Recover The Levels Of Service And Operating Performance