The New Terril Stake Axis Is Made Up Of 05 (Five) Conveyors And A Heap -On Machine, To Transport And Store The Sterile From The Laundromat With A 250 T/H Flow. This Transport Is Carried Out Through:: The Us-S3 Bis Band In Length 35M The Ul-S2 Strip Conveyor In Length 255M The Lug-S3-S3 Length 533M Band Conveyor The Ul-S4 Tape Conveyor In Length 190M The Ul-S5 Strip Conveyor In Length 140M The Sterile Storage Is Carried Out By The Conveyor Ul-S5 And A Degrete Machine With A Speed Of 250 T/H. Studies Geotechnical And Topographic Studies, Civil Engineering And Formulation Of Concrete And Establishment Of Execution Plans, Mechanical Study: Civil Geie Works Site Installation, Cleaning And Folding At The End Of Work, Earthworks - Backfilling, Construction Of An Embankment Embankment For The Assembly Of The Mortgage Machine Supply And Installation Of Prefabricated Crosspieces For Conveyors' Support. Construction Of Massifs For Conveyors (Towers, Pale, Tension Systems, Chassis, Etc.) Various Seals, Mechanical Work And Metal Framework Extension Of The Us-S3 Bis Conveyors In Length About 35M Supply And Assembly Of The Ul-S2 Conveyor In Length Approximately: 255M Supply And Assembly Of The Ul-S3 Conveyor In Length Approximately: 533M Supply And Assembly Of The Ul-S4 Conveyor In Length Approximately: 190M Supply And Assembly Of The Ul-S5 Conveyor In Length Approximately: 140M Supply And Assembly Of A Degrete Machine Various Metal Construction Works In Boilermaking And Welding Including The Supply, Making And Assembly Commissioning Tests