According To The Contents Of This Project, It Is Proposed To Arrange The Roof Of The Building In Order To Solve The Important And Continuous Leaks That Presents And Eliminate The Structural And Conservation Problems, Lack Of Consolidation And Deterioration That Through The Building And Its Roof Presents. The Partial Structural Consolidation Of The Main Facade Is Also Expected To The Significant Deterioration Of This Caused By The Decomposition Of The Country'S Saulonian Stone And The Need To Consolidate And Stabilize Structurally Through Straps.