Open Procedure, Divided Into 4 Lots, For The Assignment, By Means Of 36 Months, 12 Renewable, With A Single O.E. For Each Lot, The Supplies Of Workshops Of The Laboratories Of The University Is'È'È È Â Of The Sannio