Installation Of A Water Pumping System With A Capacity Of 550 Cubic Meters/Hour With An Electrical Control Cabinet. Tha Manao Low Pressure Raw Water Pumping Station Lam Narai Subdistrict Chai Badan District Lopburi Province Provincial Waterworks Authority, Chai Badan Branch