Double Wooden Windows (Kastenfenster) With Motorized Blinds: 71 Pcs; Wooden Windows 152 Pcs; Flame Protection Windows: 21 Pcs; Window Restoration: 4 Pcs; New Wooden Doors: 17 Pcs; Door Restoration: 2 Pcs. The Duration Of The Work Is 110 Working Days, To Begin In The Second Half Of 2026. The Work Is Awarded At Unit Prices.