Paint, Air Drying, Red Oxide Zinc Chrome Priming. Matl.& Specn : Is: 2074 / 2023 With Ad Ditional Req Uirements Of Icf/Md/Spec-045, (Issue Status 02, Rev. 03), Dated 14.06.2007 With Rdso Am End. No. 1A (Rev. 1.0). [ Warranty Period: 12 Months After The Date Of Delivery Supply In 20 Ltr. Non-Returnable New Ms-Drums., Mfg Date Within 2 Months From Date Of Supply [ Warranty Period: 12 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 La Cs ] ]