Remaining Work Of Package Wp-10 For Construction Work Of 76.01M (3X24.40M) Long Pc Girder Bridge (Ghaghat Bridge-01) At 1St (P) Km (Ch. 00+148.00M), 75.99M (2X15.25+42.68M) Long Rcc & Pc Girder Bridge (Ghaghat Bridge-02) At 1St (P) Km (Ch. 00+888.00M), 44.02M (1X42.68M) Long Pc Girder Bridge (Matherhat Bridge) At 14Th(P) Km (Ch. 13+307.00M), 25.74M (1X24.40) Long Pc Girder (Bazarpara Bridge) At 27Th(P) Kim (Ch.26 + 807.5 Km), 31.828M (1X30.488) Long Pc Girder) (Halhalai Bridge) At 32Th(P) Km (Ch.31+259.69 Km) Of Gaibandha-Sundorgonj-Pirgacha (Kadontoly) Road (Z-5613) And 44.020M (1X42.68) Long Pc Girder Bridge (Shakdaho Bridge) At 27Th Km (Ch.26+719) Of Gaibandha-Gobindaganj Via Nakahihat Road (Z-5554) Under Road Division, Gaibandha During The Year 2025-2026 (Package-Wp-10A)