Supply Of Stainless Steel Tubes And Double Ferrule Fittings For 3 Phase Memu/D Mc Coaches As Per Icf/Md/Spec-166 Issue Status -01 Rev.04 And Ammendment 01 To 02 And To M Aterial Schedule No. Icf/Sk-10-2-646 Issue Status -01 Rev.00, As Per Drawing: Material Schedule No.Icf/Sk-10-2-646 Without Item No. 25.1 To 25.10 Issue Status-01 , Rev-01. Make: Fluidteq Systems Or Similar. [ Warranty Period: 30 Months After The Date Of Delivery ] ]