Ap-272-Tp-139/2025 Development Of Design And Cost Estimate Documentation For The Modernization Of The Existing Sswin System By Replacing It With An Integrated System Of The Ciizt Building Of The Lublin University Of Technology At Ul. Nadbystrzycka 36C In Lublin, Including Author'S Supervision