Hiring Of Maxi Cab (Non-Air Condition, Bharat Stage-Iii On Or After 31/10/2023 With Diesel/ Lpg/ Cng Engine) In Perfect Good Running Condition Of Performing A Very Long Journey And Should Be Covered Anywhere Without Any Trouble On Daily Wage Basis For Official Used Under Control Of The Assistant Engineer, Lalbagh Sub-Division, P.H.E Dte.