Bank Maintenance Construction Project As Part Of The Following Construction Phases (Ba): Ba I – Renewal Of The South Bank Of The Outer Harbor From Harbor Km 0.67 To Harbor Km 1.17 (500 M) Ba Ii – Renewal Of The North Bank Of The Parallel Harbor From Harbor Km 0.79 To Harbor Km 1.30 (510 M) Ba Iii – Renewal Of The North Bank Of Harbor Basin C, From Harbor Km 3.79 To Harbor Km 4.44 (650 M)